Mechanical Design Studio ME185b - Spring 1999
ME185: The Final Stretch
Revised Milestone Schedule
Risk Reduction Test (10% of grade): Tue. or Wed. Lab, Mar. 30 & 31
Devise a test to show that your overall concept will work using actuators from the control switches
Preliminary Design Review (20% of grade) Tue. or Wed. Lab, April 13 & 14
A complete machine must be able to perform the contest and win with a "dummy" opponent, which will be described latter.
Dry Run of Presentation Tue. or Wed. Lab, April 20 & 21
Prepare Overheads and Give 1-2 minute presentation on machine.
Turn in Machine Name
Final Contest, Monday April 26: , 7-9pm
Weekly Assignment Due At Each Lab
Homework for the rest of the semester is related to your machines. Expected time requirement is about 10 hours per week, but may vary depend on the complexity of your machine. Turn in at the beginning of each lab period.
Resources