February 22, 1999 Mechanical Design Studio ME185b - Spring 1999

 

Assignment 9: Scheduling

Due Next Week at the beginning of lab (Mar. 2 &3)

 

Project Management: Be Proactive, not Reactive!

• Write out your planned schedule to the end of the course on a Gantt Chart like the one showed below (it helps to turn the page sideways). Include details of part by part fabrication. A working machine should be completed by the Preliminary Design review (PDR), on April 5&6. Make sure to leave a week for redesign and a week for testing after the PDR. Keep a copy of the Gantt for yourself and update as progress is made.

• Make a more detailed Gantt chart for just the next two weeks . Put time estimates in hours for each task. Throughout the week, add actual time spent for each task.

Example Gantt Chart

 

2/27

3/6

break

break

3/27

4/3

PDR

4/10

4/17

4/24

Feasibility of lift

                 

Define cart size and weight constraints

                 

Build cart:

                 

define motor location & wheel size

                 

build wheels

                 

build frame

                 

assemble

                 

test cart

                 

Build ball collection device

                 

xxxxx

                 

test collection device

                 

Build lift

                 

xxxxx

                 

test lift

                 

Redesign

                 

Test complete machine